| Excavation of over 200 metres of trench directly adjacent to the Redwater River. Challenges included high groundwater levels and surface runoff, as well as excavating in a pipeline ROW with nine lines in the cross section. Depth of trench was up to five metres in some locations. Reclamation of sites including topsoil replacement and re-vegetation. | ||||||||||||||
|
||||||||||||||
|
||||||||||||||
| This project consists of excavation, hauling and backfilling of contaminated soils from flair pits and drilling sumps Approximately 350,000m^3 of soil has been moved in this field with the majority of it hauled to landfill. The treatable soils were hauled to a central bio-treatment pad and treated using our microenfractionator or twister soil remediation buckets. |
||||||||||||||
|
||||||||||||||
|
||||||||||||||
| Excavation ,hauling and backfilling of over 750,000m^3 of soils from numerous sites across Alberta working with the local Aboriginal communities to provide us with manpower and equipment. |
||||||||||||||
|
||||||||||||||
|
||||||||||||||
| Installation of four dual lines (air sparge and extraction) underneath Highway 16 in downtown Edson. Challenges included no hydrovac locates allowed on Highway 16 and extremely challenging ground conditions. |
||||||||||||||
|
||||||||||||||
|
||||||||||||||
| Supply equipment for excavation of contaminated soils, hauling to landfill and supplying backfill. |
||||||||||||||