Project Summary |
|
| Project Name: |
Keystone Pipeline |
| Client: |
Trans Canada |
| Consultant: |
|
| Location: |
Eastern Alberta |
| Project Team: |
Jordan Kuhn/ Trevor Hittel |
| Project Description: |
Topsoil Tackifying; erosion control; grass seeding; straw crimping on 250km of pipeline ROW |
|
 |
|
|
Major reclamation project for Keystone Pipeline of over 250 km of pipeline reclamation in Eastern Alberta consisting of tackifying, seeding and straw crimping.
|
 |
Project Summary |
|
| Project Name: |
Reclamation of Watercourse |
| Client: |
Redwater Water Disposal Company Ltd. |
| Consultant: |
AMEC |
| Location: |
Redwater |
| Project Team: |
Mark McCush, Jason Pratt, Chance MacMillan |
| Project Description: |
Excavating and disposal of saline impacted soil and recontouring river channel. |
|
 |
|
The project consisted of removal and excavation of over 18,000 tonnes of brine impacted soil. Major challenges involved extreme weather fluctuations, intricate excavation logistics, discovery of ruptured pipeline within excavation not belonging to client as well as landowner compliance issues.
|
 |
Project Summary
|
|
| Project Name: |
Dike Reclamation |
| Client: |
Syncrude |
| Consultant: |
n/a |
| Location: |
Syncrude Aurora |
| Project Team: |
Kevin Hunsche, Ivan Hansen, Nathan Goose |
| Project Description: |
Swale contouring, lining and hyrdoseeding |
|
 |
|
|
Reclamation of tailings sand dyke including the re-contouring of drainage gullies formed by run-off. The trenches required excavator work to smooth out after which seed was placed underneath erosion control matting and then further hyrdoseeded. Challenges included running machinery on extensive slopes as well as cold weather hydro-seeding.
|
 |
Project Summary |
|
| Project Name: |
Keystone Pipeline |
| Client: |
Trans Canada |
| Consultant: |
|
| Location: |
Eastern Alberta |
| Project Team: |
Jordan Kuhn/ Trevor Hittel |
| Project Description: |
Pipeline Reclamation: |
|
 |
|
|
Reclamation included tackifying, erosion control, seeding and straw crimping of over 250 km of pipeline ROW.
|
 |
Project Summary |
| Project Name: |
Enbridge Pipeline |
| Client: |
Enbridge Pipeline |
| Consultant: |
|
| Location: |
Mordan, Manitoba |
| Project Team: |
Todd Turner / Gary Callihoo |
| Project Description: |
Reclamation of pipeline ROW through major golf course. |
|
 |
Reclamation included site grading, creek bank rehabilitation, replacement of topsoil and erosion control.
 |
Project Summary |
|
| Project Name: |
Enbridge Pipeline |
| Client: |
Enbridge Pipeline |
| Consultant: |
|
| Location: |
Edmonton, AB to Gretna, MB |
| Project Team: |
Todd Turner/Trevor Hittel |
| Project Description: |
Pipeline Reclamation. |
|
 |
|
| Reclamation of over 750 km of pipeline ROW; Scope of work included tackifying, seeding and straw crimping along entire length of ROW. |
 |
Project Summary |
|
| Project Name: |
Site Reclamation |
| Client: |
Orphan Well |
| Consultant: |
Various |
| Location: |
Alberta |
| Project Team: |
Trevor Hittel |
| Project Description: |
Site Reclamation |
|
 |
|
|
Supply equipment for full reclamation of lease sites, access roads and abandoned sites.
|